City of Mechelen

Swimming is not a luxury. Mechelen is making it a right.

With four mobile swimming pools, the City of Mechelen is bringing swimming facilities to the places where they are most needed: close to schools, clubs and local residents, without having to wait years for a new swimming pool.
3x Swimclad 25m — 1x Double Swimclad 25m
2026
In figures

The impact in figures

Four mobile swimming pools, spread across the city. Not to meet targets, but to bring swimming facilities closer to those who need them.

children per school year with access to swimming waters
20000 +
swimming pools in strategic locations
4
additional swimming water
900
First pool operational
Sept 2026
The challenge

Waiting for a swimming pool is not an option for a child who wants to learn to swim

Like many Flemish cities and municipalities, Mechelen is facing a structural shortage of swimming facilities: outdated infrastructure, long waiting lists for swimming lessons and a construction programme for a new swimming pool that could take years to complete.

Meanwhile, demand is growing. Schools are not being allocated enough swimming lessons, clubs cannot find any available pools, and too many children are at risk of growing up without the chance to learn to swim safely. For Mechelen, it was clear: those children cannot wait until the building plans are finalised.

The solution

The swimming pool comes to the people, not the other way round

Vier zwembaden, verspreid over de stad, op de plekken waar de nood het hoogst is.

Swimwise Pools is installing four portable swimming pools at strategic locations in Mechelen: close to schools, sports centres and neighbourhoods. Children no longer have to take the bus to a swimming pool on the other side of the city. The swimming pool is already in their neighbourhood.

The pools are modular and scalable: as demand changes, capacity grows accordingly. They are fully equipped with changing rooms and toilet facilities, and use natural swimming water. This means that every child, every club and every local resident has access to a fully-fledged swimming facility, without years of construction work.

The process

From analysis to operational swimming pool

Not years of construction, but a flexible process that will make additional swimming areas available in the short term.

Analysis
0 1

2 weeks

Design
0 2

Permanent solution

Production
0 3

2 months

Placement
0 4

2 weeks

Handover
0 5

September 2026

Results

More opportunities to go swimming, close to home

More opportunities for every child to learn to swim

Schools will have easier access to swimming facilities and shorter waiting times, so that no child has to miss their swimming lessons.

Swimming spots nearby, not on the other side of town

Clubs and local residents can visit venues close to home, located throughout Mechelen.

A step closer to swimming as a right, not a privilege

The portable pools are already providing Mechelen with additional swimming capacity today, whilst the city continues to work on its long-term plans for the future.

With an additional 900 m² of swimming space, Mechelen will soon be reaching more than 20,000 children per school year. Not somewhere far away, but close to their school, their club and their neighbourhood. In this way, Swimwise Pools ensures that swimming is not a matter of chance or postcode, but of a city that invests in its residents.

“We’re creating facilities where the need is greatest. We’re bringing the swimming pool to the residents, not the other way round.”

Christophe Lecocque
Director, Swimwise
Technical specifications

For those who want to know the details

Four fully-fledged Swimclad facilities, designed down to the last detail, so that the focus can be on what really matters: people learning to swim.

4 moveable swimming pools

Three 25-metre Swimclad pools and one double 25-metre Swimclad pool, providing a total of 900 m² of additional swimming space

Natural swimming water

The pools use natural swimming water, with no chlorine in the pool itself.

Fully equipped

Each facility is equipped with the necessary changing rooms and toilet facilities.

Energy-efficient

Thermal insulation and energy-efficient operation help to reduce energy consumption.

Modular & scalable

Capacity can be expanded, relocated or adapted to suit local requirements.

Up and running quickly

No need to wait years for construction to be completed: the first swimming pool will be up and running as early as September 2026.

In the spotlight

Where Mechelen goes swimming

Swimming could become a right in your municipality too

Find out how Swimwise Pools can bring swimming water closer to you too.

25 July 2026

World Drowning Prevention Day 2026

Today, Swimwise is drawing extra attention to drowning prevention. Find out how learning to swim and water safety save lives.